Products Description
The head of a well-known domestic container hotel manufacturing enterprises, said the traditional hotel industry
each hotel room civil construction, installation, decoration, preparation and all other aspects of the cost together,
up to 10,000 yuan. However, with the container conversion of the hotel does not exceed 10,000 yuan. Container
hotel construction speed, no steel and concrete, no construction waste, belonging to the low-carbon and
environmentally friendly construction methods, only need to be processed in the factory according to the design
drawings, standardized, modular manufacturing greatly improved the construction schedule. After the main
steel components are made in the factory, they can be assembled at the designated location, working in a way
to assemble, quite fast. The process of hotel decoration is reduced and money is saved. Ordinary hotel rooms from
design to use need about 2 years of construction cycle, while the container hotel rooms only need a short 2 months
and can be completed, the early opening, whether calculated from the perspective of economic interests, or from the
time cost considerations, the container hotel have great advantages